The wholly-owned La Trinidad Mine sits within a grouping of 11 concessions totaling 60,204 hectares in Sinaloa, Mexico. The gold mine is approximately 110 kilometers southeast of the city of Mazatlan and 42 kilometers southeast of the town of Rosario.

La Trinidad was previously mined by Eldorado Gold Corp. ("Eldorado") from 1996-98. After completing a preliminary economic assessment, negotiating surface rights and receiving environmental permits, Marlin has completed construction and declared commercial production at La Trinidad on November 1, 2014.

The majority of the mining at La Trinidad is focused on the Taunus deposit, which is considered to be a gold-rich intermediate sulfidation state ephitermal system. The mineralization occurs in intensely silicified tectonic and quartz-matrix hydrothermal breccia. Marlin's predecessor acquired the Taunus deposit in 2005 and identified previously unknown gold mineralization by drilling the deposit to a depth of approximately 200 meters below surface.

Due to the brecciated nature of the rocktypes in the Taunus deposit, including the mineralized material, a drilling technique known as sonic drilling was initiated in late 2010, and continued through September 2011. This drilling method was used in order to achieve maximum core recovery. The result of drilling since 2005 led to the discovery of the high grade HS Zone within the Taunus deposit.

Hs Zone Expansion

Hs Zone Expansion

Press releases were disseminated by Marlin on March 1, 2017, April 3, 2017, April 10, 2017, May 24, 2017 and June 12, 2017 summarizing the assay results of holes drilled in and around the Taunus Pit since Q4 2016. Press releases were disseminated by Marlin on November 27, 2017 and December 5, 2017 summarizing the assay results of holes drilled in and around the Colinas target area. These press releases can be found under Marlin's profile on SEDAR at www.sedar.com

Hs Zone Expansion

Hs Zone Expansion

  • Future planned production estimated at 913,000 tonnes crushed at 1.46 g/t Au totaling 42,800 ounces of gold stacked on the leach pad by Q3 2019
  • Leach recovery of over 30,000 ounces of gold by end of 2019 (1)
(1) Estimated from current mine plan @ 65% leach recovery of gold